Thickener rise rate, solids loading and flocculant calculator
Enter the thickener diameter, solids feed and overflow. Add the flocculant dose and solution strengths to get the dosing pump flow and dilution water.
The example values are filled in so you can see how it works. Results update as you type.
The formula
where
- overflow volume flow (m³/h)
- thickener area (m²)
- dry solids feed rate (t/h); solids loading in t/h per m²
Want the background? Read Thickener operation: bed level, flocculant dosing, rise rate and troubleshooting.
Discuss your plant with a metallurgist
Tiegel is a Perth metallurgy company. We help with testwork, plant optimisation, metal accounting and investigations.
Talk to a metallurgistThese calculators use standard published formulas and are provided as a guide. Check results before relying on them for design or reporting.