Monthly mill throughput and grade forecast calculator

Enter up to five weeks, each with its days in the month, shutdowns, run rate and ore mix. See the month's tonnes, grade and ounces, the stockpile run-down and the gap to budget.

Plant
Ore sources and stockpiles
SourceNameGrade g/tOpening stock dry tDelivered in month dry t
1
2
3
4

Deliveries are spread evenly over the days of the month. Leave opening stock and deliveries at 0 to skip a source’s check.

Weeks of the month
WeekDays in monthPlanned shutdown hRun rate t/hSource 1 %Source 2 %Source 3 %Source 4 %
Week 1
Week 2
Week 3
Week 4
Week 5

Enter the days of each week that fall in the month (a 30-day month might be 7, 7, 7, 7 and 2). Set unused weeks to 0 days. Each week’s ore mix must add to 100%.

Recovery
Budget for the month (optional)

Leave all three at 0 to skip the comparison.

Results

The example values are filled in so you can see how it works. Results update as you type.

The formula

Tw=(24dw−Hsd)×A×U×Qw×(1−M100)Si closing=Si opening+Di−∑Twxi,wgold recovered (oz)=∑Twgw×R31.1035

where

Tw
dry tonnes milled in week w
dw, Hsd
days of the week that fall in the month, and planned shutdown hours
A, U, Qw, M
availability and utilisation (fractions), run rate (t/h) and moisture (% wet basis; drops out for a dry run rate)
Si, Di
stockpile of source i and ore delivered to it in the month (dry t), with deliveries spread evenly by day
xi,w, gw
share of source i in week w and the week’s blended head grade (g/t)
R
recovery: a fixed figure, or (head grade − tail grade) ÷ head grade

Want the background? Read Month-end metal accounting: check-in, check-out, unaccounted metal and the AMIRA P754 code.

Discuss your plant with a metallurgist