Dense medium (ferrosilicon) make-up and cyclone feed calculator
Enter the target medium density and the ferrosilicon density. Add the ore feed, the medium-to-ore ratio and the cyclone size to get the medium flow and the feed head.
The example values are filled in so you can see how it works. Results update as you type.
The formula
where
- medium density (t/m³, numerically the same as SG)
- volume fraction of ferrosilicon in the medium
- density of the ferrosilicon powder, about 6.8 t/m³
- density of water, 1.0 t/m³
Want the background? Read Spodumene dense media separation plant design: cut densities, ferrosilicon medium and cyclone sizing.
Discuss your plant with a metallurgist
Tiegel is a Perth metallurgy company. We help with testwork, plant optimisation, metal accounting and investigations.
Talk to a metallurgistThese calculators use standard published formulas and are provided as a guide. Check results before relying on them for design or reporting.